-
Shaw, Conor / de Andrade Pereira, Flavia / Farghaly, Karim / Hoare, Cathal / Hartmann, Timo / O'Donnell, James (2024): Life cycle cost analysis at scale: a reference architecture-based approach. Dans: Built Environment Project and Asset Management, v. 14, n. 5 (10 septembre 2024).
https://doi.org/10.1108/bepam-07-2023-0132
-
Chacón, Rolando / Posada, Hector / Ramonell, Carlos / Jungmann, Manuel / Hartmann, Timo / Khan, Rehan / Tomar, Rahul (2024): Digital twinning of building construction processes. Case study: A reinforced concrete cast-in structure. Dans: Journal of Building Engineering, v. 84 (mai 2024).
https://doi.org/10.1016/j.jobe.2024.108522
-
Gürcanlı, Gürkan Emre / Hartmann, Timo (2024): Digitalization for safer restoration practices of industrial buildings using building information modelling (BIM): A review and a case study for gasometers. Dans: Digital Applications in Archaeology and Cultural Heritage, v. 32 (mars 2024).
https://doi.org/10.1016/j.daach.2023.e00313
-
Mengiste, Eyob / García de Soto, Borja / Hartmann, Timo (2022): Recognition of the condition of construction materials using small datasets and handcrafted features. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022).
https://doi.org/10.36680/j.itcon.2022.046
-
Wiesweg, Niklas / Schäpers, Philipp / Bernhold, Torben / Hartmann, Timo (2022): On the challenges of inter-organisational data in real estate: the role of knowledge sharing. Dans: Engineering, Construction and Architectural Management, v. 31, n. 1 (septembre 2022).
https://doi.org/10.1108/ecam-12-2021-1081
-
Pinzon Amorocho, Jerson Alexis / Hartmann, Timo (2022): A multi-criteria decision-making framework for residential building renovation using pairwise comparison and TOPSIS methods. Dans: Journal of Building Engineering, v. 53 (août 2022).
https://doi.org/10.1016/j.jobe.2022.104596
-
Hartmann, Timo / Trappey, Amy (2020): Advanced Engineering Informatics - Philosophical and methodological foundations with examples from civil and construction engineering. Dans: Developments in the Built Environment, v. 4 (novembre 2020).
https://doi.org/10.1016/j.dibe.2020.100020
-
Hartmann, Timo (2016): Advancing ECAM knowledge: stepping stones and the shoulder of giants. Dans: Engineering, Construction and Architectural Management, v. 23, n. 3 (mai 2016).
https://doi.org/10.1108/ecam-03-2016-0076
-
Ungureanu, Lucian Constantin / Hartmann, Timo / Serbanoiu, Ion (2019): Quantitative lean assessment of line of balance schedules’ quality. Dans: Engineering, Construction and Architectural Management, v. 26, n. 2 (mars 2019).
https://doi.org/10.1108/ecam-05-2017-0088
-
Whyte, Jennifer K. / Hartmann, Timo (2017): How digitizing building information transforms the built environment. Dans: Building Research & Information, v. 45, n. 6 ( 2017).
https://doi.org/10.1080/09613218.2017.1324726
-
Smits, Wim / van Buiten, Marc / Hartmann, Timo (2017): Yield-to-BIM: impacts of BIM maturity on project performance. Dans: Building Research & Information, v. 45, n. 3 ( 2017).
https://doi.org/10.1080/09613218.2016.1190579
-
van Amstel, Frederick M. C. / Zerjav, Vedran / Hartmann, Timo / van der Voort, Mascha C. / Dewulf, Geert P. M. R. (2015): Expanding the representation of user activities. Dans: Building Research & Information, v. 43, n. 2 ( 2015).
https://doi.org/10.1080/09613218.2014.932621
-
Hartmann, Timo / Fischer, Martin (2007): Supporting the constructability review with 3D/4D models. Dans: Building Research & Information, v. 35, n. 1 ( 2007).
https://doi.org/10.1080/09613210600942218
-
Zerjav, Vedran / Hartmann, Timo / Achammer, Christoph (2013): Managing the process of interdisciplinary design: identifying, enforcing, and anticipating decision-making frames. Dans: Architectural Engineering and Design Management, v. 9, n. 2 (mai 2013).
https://doi.org/10.1080/17452007.2013.775106
-
Hartmann, Timo / Amor, Robert / East, E. William (2017): Information Model Purposes in Building and Facility Design. Dans: Journal of Computing in Civil Engineering, v. 31, n. 6 (novembre 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000706
-
Hartmann, Timo (2014): Semiotic User Interface Analysis of Building Information Model Systems. Dans: Journal of Computing in Civil Engineering, v. 28, n. 5 (septembre 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000358
-
Vossebeld, Niels / Hartmann, Timo (2016): Modeling Information for Maintenance and Safety along the Lifecycle of Road Tunnels. Dans: Journal of Computing in Civil Engineering, v. 30, n. 5 (septembre 2016).
https://doi.org/10.1061/(asce)cp.1943-5487.0000593
-
Hartmann, Timo / van Meerveld, Hendrik / Vossebeld, Niels / Adriaanse, Arjen (2012): Aligning building information model tools and construction management methods. Dans: Automation in Construction, v. 22 (mars 2012).
https://doi.org/10.1016/j.autcon.2011.12.011
-
Peterson, Forest / Hartmann, Timo / Fruchter, Renate / Fischer, Martin (2011): Teaching construction project management with BIM support: Experience and lessons learned. Dans: Automation in Construction, v. 20, n. 2 (mars 2011).
https://doi.org/10.1016/j.autcon.2010.09.009
-
Trebbe, Martijn / Hartmann, Timo / Dorée, André (2015): 4D CAD models to support the coordination of construction activities between contractors. Dans: Automation in Construction, v. 49 (janvier 2015).
https://doi.org/10.1016/j.autcon.2014.10.002
-
olde Scholtenhuis, Léon L. / Hartmann, Timo / Dorée, André G. (2016): 4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects. Dans: Automation in Construction, v. 62 (février 2016).
https://doi.org/10.1016/j.autcon.2015.10.013
-
van den Berg, Marc / Voordijk, Hans / Adriaanse, Arjen / Hartmann, Timo (2017): Experiencing Supply Chain Optimizations: A Serious Gaming Approach. Dans: Journal of Construction Engineering and Management, v. 143, n. 11 (novembre 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001388
-
olde Scholtenhuis, Léon L. / Hartmann, Timo / Dorée, André G. (2016): Testing the Value of 4D Visualizations for Enhancing Mindfulness in Utility Reconstruction Works. Dans: Journal of Construction Engineering and Management, v. 142, n. 7 (juillet 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001126
-
Hartmann, Timo / Gao, Ju / Fischer, Martin (2008): Areas of Application for 3D and 4D Models on Construction Projects. Dans: Journal of Construction Engineering and Management, v. 134, n. 10 (octobre 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:10(776)
-
Zerjav, Vedran / Hartmann, Timo / Javernick-Will, Amy (2012): Internal Governance of Design and Engineering: The Case of the Multinational Firm. Dans: Journal of Construction Engineering and Management, v. 138, n. 1 (janvier 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000417
-
Hartmann, Timo / Levitt, Raymond E. (2010): Understanding and Managing Three-Dimensional/ Four-Dimensional Model Implementations at the Project Team Level. Dans: Journal of Construction Engineering and Management, v. 136, n. 7 (juillet 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000174
-
Hartmann, Timo (2011): Goal and Process Alignment during the Implementation of Decision Support Systems by Project Teams. Dans: Journal of Construction Engineering and Management, v. 137, n. 12 (décembre 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000389