David Harris
- The accuracy of housing forecasting in Australia. Dans: Engineering, Construction and Architectural Management, v. 10, n. 4 (août 2003). (2003):
- Depressurisation for the excavation of Stepney Green cavern. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 168, n. 3 (juin 2015). (2015):
- What lies beneath: surveying the Thames at Woolwich. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 159, n. 1 (février 2006). (2006):
- Crossrail project: engineering design management on the Elizabeth line, London. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 170, n. 5 (mai 2017). (2017):
- Crossrail project: a deep-mined station on the Elizabeth line, London. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 170, n. 5 (mai 2017). (2017):