Zhongshu Han
- (2018): Loading steps in analyzing the interaction between the tied arch continuous bridge and multiple tracks. Présenté pendant: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- Longitudinal Force of Continuously Welded Rail on Suspension Bridge with Length Exceeding 1000 m. Dans: Structural Engineering International, v. 29, n. 3 (juillet 2019). (2019):