A. Hamilton
- Project start-up phase: the weakest link. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 156, n. 4 (décembre 2003). (2003):
- Project management reform: a public body case study. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 157, n. 3 (septembre 2004). (2004):
- Managing projects: the role of a project support office. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 159, n. 3 (septembre 2006). (2006):
- Project history of Dublin's River Liffey bridges. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 156, n. 4 (décembre 2003). (2003):
- Salt crystallization damage: Understanding strain at the atomic scale. Présenté pendant: Structural Analysis of Historical Constructions (SAHC) 2016, Leuven, Belgium, 13-15 September 2016. (2016):
- Low-pressure nano-silica injection on cement for crack-healing and water transport. Présenté pendant: Structural Analysis of Historical Constructions (SAHC) 2016, Leuven, Belgium, 13-15 September 2016. (2016):