0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Huh, Seung-Ha / Ham, Namhyuk / Kim, Ju-Hyung / Kim, Jae-Jun (2023): Quantitative impact analysis of priority policy applied to BIM-based design validation. Dans: Automation in Construction, v. 154 (octobre 2023).

    https://doi.org/10.1016/j.autcon.2023.105031

  2. Kim, Taewan / Yoon, Youngjoon / Lee, Byeongdo / Ham, Namhyuk / Kim, Jae-Jun (2022): Cost–Benefit Analysis of Scan-vs-BIM-Based Quality Management. Dans: Buildings, v. 12, n. 12 (1 décembre 2022).

    https://doi.org/10.3390/buildings12122052

  3. Biabani, Fatemeh / Kim, Ju-Hyung / Ham, Namhyuk (2022): Qualitative Assessment of Collaborative Behavior Based on Self-Perception Personality Tests for BIM Staff. Dans: Buildings, v. 12, n. 4 (11 avril 2022).

    https://doi.org/10.3390/buildings12040426

  4. Wee, Kyungsoo / Ham, Namhyuk / Kim, Jae-Jun (2022): Microscopical Resource Allocation for Large-Scale Apartment Foundation Work Using Queuing Systems. Dans: Buildings, v. 12, n. 2 (18 janvier 2022).

    https://doi.org/10.3390/buildings12020089

  5. Moon, Sungkon / Ham, Namhyuk / Kim, Sungjin / Hou, Lei / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Dans: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).

    https://doi.org/10.1108/ecam-07-2018-0312

  6. Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Optimal BIM staffing in construction projects using a queueing model. Dans: Automation in Construction, v. 113 (mai 2020).

    https://doi.org/10.1016/j.autcon.2020.103123

  7. Ham, Namhyuk / Lee, Sanghyo (2019): Project Benefits of Digital Fabrication in Irregular-Shaped Buildings. Dans: Advances in Civil Engineering, v. 2019 ( 2019).

    https://doi.org/10.1155/2019/3721397

  8. Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2018): Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001498

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine