-
Huang, Rong‐Yau / Halpin, Daniel W. (2000): Graphically based LP modelling for linear scheduling analysis: the POLO system. Dans: Engineering, Construction and Architectural Management, v. 7, n. 1 (janvier 2000).
https://doi.org/10.1108/eb021131
-
Halpin, Daniel W. (1988): Feasibility of robotics in construction. Présenté pendant: 13th IABSE Congress, Helsinki, Finland, 6-10 June 1988.
https://doi.org/10.5169/seals-13047
-
Halpin, Daniel W. (1990): Automated construction technology: background and barriers. Dans: IABSE Proceedings, v. 14 ( 1990).
https://doi.org/10.5169/seals-42839
-
Halpin, Daniel W. / Huang, Rong-Yau (1995): Competition and Future Needs of International Clients. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 121, n. 3 (juillet 1995).
https://doi.org/10.1061/(asce)1052-3928(1995)121:3(191)
-
Hastak, Makarand / Halpin, Daniel W. (2000): Assessment of Life-Cycle Benefit-Cost of Composites in Construction. Dans: Journal of Composites for Construction, v. 4, n. 3 (août 2000).
https://doi.org/10.1061/(asce)1090-0268(2000)4:3(103)
-
Halpin, Daniel W. / Paulson, Boyd C. / Schub, Adolf / Willenbrock, Jack H. (1987): Construction Education and Research in Central Europe. Dans: Journal of Construction Engineering and Management, v. 113, n. 3 (septembre 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:3(468)
-
AbouRizk, Simaan M. / Halpin, Daniel W. (1990): Probabilistic Simulation Studies for Repetitive Construction Processes. Dans: Journal of Construction Engineering and Management, v. 116, n. 4 (décembre 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(575)
-
Kangari, Roozbeh / Halpin, Daniel W. (1989): Potential Robotics Utilization in Construction. Dans: Journal of Construction Engineering and Management, v. 115, n. 1 (mars 1989).
https://doi.org/10.1061/(asce)0733-9364(1989)115:1(126)
-
Hijazi, Adib M. / AbouRizk, Simaan M. / Halpin, Daniel W. (1992): Modeling and Simulating Learning Development in Construction. Dans: Journal of Construction Engineering and Management, v. 118, n. 4 (décembre 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:4(685)
-
Halpin, Daniel W. (1993): Process‐Based Research to Meet the International Challenge. Dans: Journal of Construction Engineering and Management, v. 119, n. 3 (septembre 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:3(415)
-
Gonzalez‐Quevedo, Antonio A. / AbouRizk, Simaan M. / Iseley, David T. / Halpin, Daniel W. (1993): Comparison of Two Simulation Methodologies in Construction. Dans: Journal of Construction Engineering and Management, v. 119, n. 3 (septembre 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:3(573)
-
AbouRizk, Simaan M. / Halpin, Daniel W. / Wilson, James R. (1994): Fitting Beta Distributions Based on Sample Data. Dans: Journal of Construction Engineering and Management, v. 120, n. 2 (juin 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:2(288)
-
Huang, Rong-Yau / Halpin, Daniel W. (1995): Graphical-Based Method for Transient Evaluation of Construction Operations. Dans: Journal of Construction Engineering and Management, v. 121, n. 2 (juin 1995).
https://doi.org/10.1061/(asce)0733-9364(1995)121:2(222)
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Pile Construction Productivity Assessment. Dans: Journal of Construction Engineering and Management, v. 131, n. 6 (juin 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:6(705)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Process versus Data Oriented Techniques in Pile Construction Productivity Assessment. Dans: Journal of Construction Engineering and Management, v. 130, n. 4 (août 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:4(490)
-
AbouRizk, Simaan M. / Gonzalez-Quevedo, Antonio A. / Halpin, Daniel W. (1990): Applications of Variance Reduction Techniques in Construction Simulation. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 5, n. 4 (décembre 1990).
https://doi.org/10.1111/j.1467-8667.1990.tb00390.x
-
AbouRizk, Simaan M. / Halpin, Daniel W. / Hill, Stephen L. (1991): Measuring Productivity and Validating Microcomputer Simulation. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 6, n. 3 (mai 1991).
https://doi.org/10.1111/j.1467-8667.1991.tb00404.x
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Productivity and Cost Regression Models for Pile Construction. Dans: Journal of Construction Engineering and Management, v. 131, n. 7 (juillet 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:7(779)
-
Lee, Sangyoub / Halpin, Daniel W. (2003): Predictive Tool for Estimating Accident Risk. Dans: Journal of Construction Engineering and Management, v. 129, n. 4 (août 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:4(431)
-
Halpin, Daniel W. (2007): Fifty Years of Progress in Construction Engineering Research. Dans: Journal of Construction Engineering and Management, v. 133, n. 9 (septembre 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:9(635)
-
Showalter, W. Eric / Halpin, Daniel W. (2008): Dynamic Programming Approach to Optimization of Site Remediation. Dans: Journal of Construction Engineering and Management, v. 134, n. 10 (octobre 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:10(820)
-
Zayed, Tarek M. / Halpin, Daniel W. (2005): Deterministic models for assessing productivity and cost of bored piles. Dans: Construction Management and Economics, v. 23, n. 5 (juin 2005).
https://doi.org/10.1080/01446190500039911
-
Zayed, Tarek M. / Halpin, Daniel W. / Basha, Ismail M. (2005): Productivity and delays assessment for concrete batch plant‐truck mixer operations. Dans: Construction Management and Economics, v. 23, n. 8 (octobre 2005).
https://doi.org/10.1080/01446190500184451
-
Sawhney, Anil / AbouRizk, Simaan M. / Halpin, Daniel W. (1998): Construction project simulation using CYCLONE. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 25, n. 1 (février 1998).
https://doi.org/10.1139/l97-047
-
Halpin, Daniel W. / Huang, Rong-Yau (1995): A process-based approach to value-added construction — the CYCLONE/DISCO system. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 6 (décembre 1995).
https://doi.org/10.1139/l95-124
-
Lee, Sangyoub / Halpin, Daniel W. / Chang, Hoon (2006): Quantifying effects of accidents by fuzzy-logic- and simulation-based analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 3 (mars 2006).
https://doi.org/10.1139/l05-026
-
Senior, Bolivar A. / Halpin, Daniel W. (1998): Simplified Simulation System for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 124, n. 1 (janvier 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:1(72)
-
Shi, Jonathan Jingsheng / Halpin, Daniel W. (2003): Enterprise Resource Planning for Construction Business Management. Dans: Journal of Construction Engineering and Management, v. 129, n. 2 (mars - avril 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:2(214)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Quantitative Assessment for Piles Productivity Factors. Dans: Journal of Construction Engineering and Management, v. 130, n. 3 (juin 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:3(405)
-
Zayed, Tarek M. / Halpin, Daniel W. (2004): Simulation as a Tool for Pile Productivity Assessment. Dans: Journal of Construction Engineering and Management, v. 130, n. 3 (juin 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:3(394)