Robert Hairstans
- Refocusing modern methods of construction on the climate emergency: a 'five capitals' model for action. Dans: The Structural Engineer, v. 98, n. 9 (septembre 2020). (2020):
- Offsite HUB (Scotland): establishing a collaborative regional framework for knowledge exchange in the UK. Dans: Architectural Engineering and Design Management, v. 14, n. 1-2 (décembre 2017). (2017):
- Viability of cross-laminated timber from UK resources. Dans: Proceedings of the Institution of Civil Engineers - Construction Materials, v. 168, n. 3 (juin 2015). (2015):
- Racking Performance of Structural Insulated Panels. Dans: Journal of Structural Engineering (ASCE), v. 132, n. 11 (novembre 2006). (2006):