Daniel M. Hahn
- Exchange Place Station Subsurface Reconstruction and Improvements. Dans: Journal of Construction Engineering and Management, v. 118, n. 1 (mars 1992). (1992):
- George Washington Bridge Redecked with Prefabricated, Prepaved Steel Panels. Dans: Civil Engineering Magazine, v. 47, n. 12 (décembre 1977). (1977):