Desai Guo
- Risk assessment of shield construction adjacent to the existing shield tunnel based on improved nonlinear FAHP. Dans: Tunnelling and Underground Space Technology, v. 155 (janvier 2025). (2025):
- Coupling Analysis of Tunnel Construction Risk in Complex Geology and Construction Factors. Dans: Journal of Construction Engineering and Management, v. 148, n. 9 (septembre 2022). (2022):