J. F. Grimes
- Greater Cairo Wastewater Project: Design of East Bank Stage 1 Works Pumping Stations, Culverts and Treatment Plant. Dans: Proceedings of the Institution of Civil Engineers, v. 78, n. 4 (août 1985). (1985):
- Conveyance system: pumping stations and culverts. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 97, n. 5 (mai 1993). (1993):