Keith Griesing
- (2015): The New Lifting Bridge in Bordeaux, France - Mechanism Design Code Constraints and Freedoms. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
- (2008): Design of Heavy Movable Structures using Advanced Modelling and Visualizations. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.
- Angular approach. Dans: Bridge Design & Engineering, n. 49 (4e trimestre 2007). (2007):