0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

David Greenwood ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Chiponde, Danstan / Gledson, Barry / Greenwood, David (2024): The Institutional Field Of Learning From Project-Related Failures – Opportunities and Challenges.. Dans: Construction Economics and Building, v. 24, n. 1 (27 juin 2024).

    https://doi.org/10.5130/ajceb.v24i1/2.8394

  2. Doukari, Omar / Kassem, Mohamad / Greenwood, David (2024): A distributed collaborative platform for multi-stakeholder multi-level management of renovation projects. Dans: Journal of Information Technology in Construction, v. 29 (février 2024).

    https://doi.org/10.36680/j.itcon.2024.011

  3. Doukari, Omar / Kassem, Mohamad / Scoditti, Enrico / Aguejdad, Rahim / Greenwood, David (2023): A BIM based tool for evaluating building renovation strategies: the case of three demonstration sites in different European countries. Dans: Construction Innovation, v. 24, n. 1 (novembre 2023).

    https://doi.org/10.1108/ci-12-2022-0314

  4. Zhao, Jianfeng / Liu, Henry J. / Love, Peter E. D. / Greenwood, David / Sing, Michael C. P. (2023): Value for Money assessments for Public-Private Partnerships: characteristics, research directions, and policy implications. Dans: Developments in the Built Environment, v. 16 (décembre 2023).

    https://doi.org/10.1016/j.dibe.2023.100246

  5. Doukari, Omar / Scoditti, Enrico / Kassem, Mohamad / Greenwood, David (2023): A BIM-based Techno-Economic Framework and Tool for Evaluating and Comparing Building Renovation Strategies. Dans: Journal of Information Technology in Construction, v. 28 (février 2023).

    https://doi.org/10.36680/j.itcon.2023.012

  6. Doukari, Omar / Seck, Boubacar / Greenwood, David (2022): The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France. Dans: Frontiers in Built Environment, v. 8 (février 2022).

    https://doi.org/10.3389/fbuil.2022.998309

  7. Msawil, Mahir / Greenwood, David / Kassem, Mohamad (2022): A Systematic evaluation of blockchain-enabled contract administration in construction projects. Dans: Automation in Construction, v. 143 (novembre 2022).

    https://doi.org/10.1016/j.autcon.2022.104553

  8. Doukari, Omar / Seck, Boubacar / Greenwood, David (2022): The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches. Dans: Buildings, v. 12, n. 8 (31 juillet 2022).

    https://doi.org/10.3390/buildings12081145

  9. Zhao, Jianfeng / Thurairajah, Niraj / Greenwood, David / Liu, Henry / Yuan, Jingfeng (2023): Unpacking the context of value for money assessment in global markets: a procurement option framework for public-private partnerships. Dans: Engineering, Construction and Architectural Management, v. 30, n. 8 (janvier 2023).

    https://doi.org/10.1108/ecam-10-2021-0963

  10. Doukari, Omar / Greenwood, David / Rogage, Kay / Kassem, Mohamad (2022): Object-centred automated compliance checking: a novel, bottom-up approach. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022).

    https://doi.org/10.36680/j.itcon.2022.017

  11. Doukari, Omar / Seck, Boubacar / Greenwood, David / Feng, Haibo / Kassem, Mohamad (2022): Towards an Interoperable Approach for Modelling and Managing Smart Building Data: The Case of the CESI Smart Building Demonstrator. Dans: Buildings, v. 12, n. 3 (8 mars 2022).

    https://doi.org/10.3390/buildings12030362

  12. Feng, Haibo / Kassem, Mohamad / Greenwood, David / Doukari, Omar (2023): Whole building life cycle assessment at the design stage: a BIM-based framework using environmental product declaration. Dans: International Journal of Building Pathology and Adaptation, v. 41, n. 1 (8 mars 2023).

    https://doi.org/10.1108/ijbpa-06-2021-0091

  13. Gledson, Barry J. / Greenwood, David (2017): The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017).

    https://doi.org/10.1108/ecam-03-2016-0066

  14. Charlton, James / Kelly, Kenneth / Greenwood, David / Moreton, Leo (2021): The complexities of managing historic buildings with BIM. Dans: Engineering, Construction and Architectural Management, v. 28, n. 2 ( 2021).

    https://doi.org/10.1108/ecam-11-2019-0621

  15. Rogage, Kay / Greenwood, David (2020): Data transfer between digital models of built assets and their operation & maintenance systems. Dans: Journal of Information Technology in Construction, v. 25 (octobre 2020).

    https://doi.org/10.36680/j.itcon.2020.027

  16. Blake, Simon / Davison, Peter / Greenwood, David / Wade, Neal (2015): Climate change risks in electricity networks. Dans: Infrastructure Asset Management, v. 2, n. 2 (mai 2015).

    https://doi.org/10.1680/iasma.14.00035

  17. Doukari, Omar / Greenwood, David (2020): Automatic generation of building information models from digitized plans. Dans: Automation in Construction, v. 113 (mai 2020).

    https://doi.org/10.1016/j.autcon.2020.103129

  18. Hamza, Neveen / Greenwood, David (2009): Energy conservation regulations: Impacts on design and procurement of low energy buildings. Dans: Building and Environment, v. 44, n. 5 (mai 2009).

    https://doi.org/10.1016/j.buildenv.2008.06.010

  19. Ponton, Hazel / Osborne, Allan / Thompson, Neill / Greenwood, David (2019): The power of humour to unite and divide: a case study of design coordination meetings in construction. Dans: Construction Management and Economics, v. 38, n. 1 (octobre 2019).

    https://doi.org/10.1080/01446193.2019.1656339

  20. Scott, Steve / Harris, Richard Anthony / Greenwood, David (2004): Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 1 (janvier 2004).

    https://doi.org/10.1061/(asce)1052-3928(2004)130:1(50)

  21. Zaher, Mohamed / Greenwood, David / Marzouk, Mohamed (2018): Mobile augmented reality applications for construction projects. Dans: Construction Innovation, v. 18, n. 2 (avril 2018).

    https://doi.org/10.1108/ci-02-2017-0013

  22. Alwan, Zaid / Greenwood, David / Gledson, Barry (2015): Rapid LEED evaluation performed with BIM based sustainability analysis on a virtual construction project. Dans: Construction Innovation, v. 15, n. 2 (avril 2015).

    https://doi.org/10.1108/ci-01-2014-0002

  23. Li, Jennifer / Greenwood, David / Kassem, Mohamad (2019): Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Dans: Automation in Construction, v. 102 (juin 2019).

    https://doi.org/10.1016/j.autcon.2019.02.005

  24. Greenwood, David / Horne, Margaret / Thompson, Emine Mine / Martin Allwood, Carl / Wernemyr, Claes / Westerdahl, Börje (2008): Strategic Perspectives on the Use of Virtual Reality within the Building Industries of Four Countries. Dans: Architectural Engineering and Design Management, v. 4, n. 2 (janvier 2008).

    https://doi.org/10.3763/aedm.2008.0076

  25. Malsane, Sagar / Matthews, Jane / Lockley, Steve / Love, Peter E. D. / Greenwood, David (2015): Development of an object model for automated compliance checking. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.10.004

  26. Greenwood, David (2001): Subcontract procurement: are relationships changing?. Dans: Construction Management and Economics, v. 19, n. 1 (janvier 2001).

    https://doi.org/10.1080/01446190010003380

  27. Greenwood, David / Gledson, Barry James (2012): The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran. Dans: Construction Management and Economics, v. 30, n. 8 (août 2012).

    https://doi.org/10.1080/01446193.2012.704595

  28. Greenwood, David / Wu, Shuwei (2012): Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Dans: Construction Management and Economics, v. 30, n. 4 (avril 2012).

    https://doi.org/10.1080/01446193.2012.666801

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine