Min Gong
- Optimization of relief hole blasting satisfying synergistic constraints of rock-breaking area and hole-bottom minimum burden. Dans: Tunnelling and Underground Space Technology, v. 154 (décembre 2024). (2024):
- In-situ high-speed 3D-DIC experiment on blast-induced second free surface characteristics at initial stage of cut blasting in a tunnel. Dans: Tunnelling and Underground Space Technology, v. 142 (décembre 2023). (2023):
- Directional fracture behavior and stress evolution process of the multi-slit charge blasting. Dans: Soil Dynamics and Earthquake Engineering, v. 152 (janvier 2022). (2022):
- Parameter calculation of the initiating circuit with mixed use of nonel detonators and electronic detonators in tunnel controlled-blasting. Dans: Tunnelling and Underground Space Technology, v. 113 (juillet 2021). (2021):