Harald Goldberger
- Why were 800 m of the Boßler Tunnel built twice? - TBM passing a shotcrete section. Dans: Geomechanics and Tunnelling, v. 10, n. 2 (avril 2017). (2017):
- Application of the Observational Method in Heterogeneous Rock Mass with Low Overburden. Dans: Felsbau, v. 24, n. 1 ( 2006). (2006):