0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Zong, Chujun / Chen, Xia / Deghim, Fatma / Staudt, Johannes / Geyer, Philipp / Lang, Werner (2024): A holistic two-stage decision-making methodology for passive and active building design strategies under uncertainty. Dans: Building and Environment, v. 251 (mars 2024).

    https://doi.org/10.1016/j.buildenv.2024.111211

  2. Chen, Xia / Sun, Ruiji / Saluz, Ueli / Schiavon, Stefano / Geyer, Philipp (2024): Using causal inference to avoid fallouts in data-driven parametric analysis: A case study in the architecture, engineering, and construction industry. Dans: Developments in the Built Environment, v. 17 (mars 2024).

    https://doi.org/10.1016/j.dibe.2023.100296

  3. Chen, Xia / Abualdenien, Jimmy / Singh, Manav Mahan / Borrmann, André / Geyer, Philipp (2022): Introducing causal inference in the energy-efficient building design process. Dans: Energy and Buildings, v. 277 (décembre 2022).

    https://doi.org/10.1016/j.enbuild.2022.112583

  4. Singh, Manav Mahan / Deb, Chirag / Geyer, Philipp (2022): Early-stage design support combining machine learning and building information modelling. Dans: Automation in Construction, v. 136 (avril 2022).

    https://doi.org/10.1016/j.autcon.2022.104147

  5. Abualdenien, Jimmy / Schneider-Marin, Patricia / Zahedi, Ata / Harter, Hannes / Exner, Hannah / Steiner, Daniel / Singh, Manav Mahan / Borrmann, André / Lang, Werner / Petzold, Frank / König, Markus / Geyer, Philipp / Schnellenbach-Held, Martina (2020): Consistent management and evaluation of building models in the early design stages. Dans: Journal of Information Technology in Construction, v. 25 (octobre 2020).

    https://doi.org/10.36680/j.itcon.2020.013

  6. Shao, Yunming / Geyer, Philipp / Lang, Werner (2014): Integrating requirement analysis and multi-objective optimization for office building energy retrofit strategies. Dans: Energy and Buildings, v. 82 (octobre 2014).

    https://doi.org/10.1016/j.enbuild.2014.07.030

  7. Harter, Hannes / Singh, Manav Mahan / Schneider-Marin, Patricia / Lang, Werner / Geyer, Philipp (2020): Uncertainty Analysis of Life Cycle Energy Assessment in Early Stages of Design. Dans: Energy and Buildings, v. 208 (février 2020).

    https://doi.org/10.1016/j.enbuild.2019.109635

  8. Schlueter, Arno / Geyer, Philipp (2018): Linking BIM and Design of Experiments to balance architectural and technical design factors for energy performance. Dans: Automation in Construction, v. 86 (février 2018).

    https://doi.org/10.1016/j.autcon.2017.10.021

  9. Geyer, Philipp / Buchholz, Martin (2012): Parametric systems modeling for sustainable energy and resource flows in buildings and their urban environment. Dans: Automation in Construction, v. 22 (mars 2012).

    https://doi.org/10.1016/j.autcon.2011.07.002

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine