M. Gaudette
- Improving the flood control at a lower cost for a future Hydro-Québec hydroelectric facility on the Toulnustouc River, Canada. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 4 (août 2003). (2003):