- (2024): The Management of Railway Operations during the Planned Interruption of Railway Infrastructure. Dans: Infrastructures, v. 9, n. 7 (16 juillet 2024).
- (2022): Effective Use of Tower Cranes over Time in the Selected Construction Process. Dans: Buildings, v. 12, n. 4 (11 avril 2022).
- Analysis of moisture and salinity of historical constructions before and after the application of REMEDIATIONS. Dans: Journal of Building Engineering, v. 41 (septembre 2021). (2021):
- Aspects of Railway Capacity and Occupation Time Estimation. Dans: Journal of Civil Engineering and Architecture, v. 8, n. 3 (mars 2014). (2014):
- (2020): Methods for the Calculation of the Lost Profit in Construction Contracts. Dans: Buildings, v. 10, n. 4 (26 mars 2020).
- Improvement Of Quality Management Level In Construction Company Using EFQM Model. Dans: Organization, Technology and Management in Construction, v. 6, n. 1 ( 2014). (2014):