-
Han, Yilong / Soomro, Mohsin Ali / Li, Yongkui / Garvin, Michael J. / Xue, Rui (2024): Exploring Farmers’ Willingness to Engage in Participatory Irrigation Infrastructure Programs: Evidence from a Water-Stressed Region. Dans: Journal of Construction Engineering and Management, v. 150, n. 6 (juin 2024).
https://doi.org/10.1061/jcemd4.coeng-13542
-
Khurana, Mayank / Garvin, Michael J. / Mahalingam, Ashwin (2022): Synthesis of Relational Practices for PPP Contracts and Their Linkage with Governance Mechanisms. Dans: Journal of Construction Engineering and Management, v. 148, n. 12 (décembre 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002405
-
Dewulf, Geert / Garvin, Michael J. (2020): Responsive governance in PPP projects to manage uncertainty. Dans: Construction Management and Economics, v. 38, n. 4 (10 mars 2020).
https://doi.org/10.1080/01446193.2019.1618478
-
Chiara, Nicola / Garvin, Michael J. / Vecer, Jan (2007): Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects. Dans: Journal of Infrastructure Systems, v. 13, n. 2 (juin 2007).
https://doi.org/10.1061/(asce)1076-0342(2007)13:2(97)
-
Cheah, Charles Y. J. / Garvin, Michael J. (2004): An open framework for corporate strategy in construction. Dans: Engineering, Construction and Architectural Management, v. 11, n. 3 (juin 2004).
https://doi.org/10.1108/09699980410535787
-
Rahimi-Golkhandan, Armin / Garvin, Michael J. / Wang, Qi (2021): Assessing the Impact of Transportation Diversity on Postdisaster Intraurban Mobility. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000872
-
Guevara, Jose / Salazar, John / Garvin, Michael J. (2020): Social Network Analysis of Road PPP Equity Markets in Canada, Chile, and the United States. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 5 (septembre 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000830
-
Wang, Yan / Taylor, John E. / Garvin, Michael J. (2020): Measuring Resilience of Human–Spatial Systems to Disasters: Framework Combining Spatial-Network Analysis and Fisher Information. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000782
-
Guevara, Jose / Garvin, Michael J. / Ghaffarzadegan, Navid (2020): The Forest and the Trees: A Systems Map of Governance Interdependencies in the Shaping Phase of Road Public–Private Partnerships. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 1 (janvier 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000726
-
Nguyen, Duc A. / Garvin, Michael J. (2019): Life-Cycle Contract Management Strategies in US Highway Public–Private Partnerships: Public Control or Concessionaire Empowerment?. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 4 (juillet 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000687
-
Antillon, Eric I. / Garvin, Michael J. / Molenaar, Keith R. / Javernick-Will, Amy (2018): Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public–Private Partnership Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 5 (septembre 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000623
-
Guevara, Jose / Garvin, Michael J. / Ghaffarzadegan, Navid (2017): Capability Trap of the U.S. Highway System: Policy and Management Implications. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000512
-
Garvin, Michael J. (2003): Strategic Characterization of Water System Infrastructure and Management. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 4 (octobre 2003).
https://doi.org/10.1061/(asce)0742-597x(2003)19:4(138)
-
Wooldridge, Stephen C. / Garvin, Michael J. / Miller, John B. (2001): Effects of Accounting and Budgeting on Capital Allocation for Infrastructure Projects. Dans: Journal of Management in Engineering (ASCE), v. 17, n. 2 (avril 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:2(86)
-
Garvin, Michael J. / Wooldridge, Stephen C. / Miller, John B. / McGlynn, The Honorable Michael J. (2000): Capital Planning System Applied to Municipal Infrastructure. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 5 (septembre 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:5(41)
-
Miller, John B. / Garvin, Michael J. / Ibbs, C. William / Mahoney, Stephen E. (2000): Toward a New Paradigm: Simultaneous Use of Multiple Project Delivery Methods. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 3 (mai 2000).
https://doi.org/10.1061/(asce)0742-597x(2000)16:3(58)
-
Garvin, Michael J. (2010): Enabling Development of the Transportation Public-Private Partnership Market in the United States. Dans: Journal of Construction Engineering and Management, v. 136, n. 4 (avril 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000122
-
Nguyen, Duc A. / Garvin, Michael J. / Gonzalez, Edwin E. (2018): Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts. Dans: Journal of Construction Engineering and Management, v. 144, n. 5 (mai 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001465
-
Cheah, Charles Y. J. / Garvin, Michael J. / Miller, John B. (2004): Empirical Study of Strategic Performance of Global Construction Firms. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:6(808)
-
Liu, Ting / Bennon, Michael / Garvin, Michael J. / Wang, ShouQing (2017): Sharing the Big Risk: Assessment Framework for Revenue Risk Sharing Mechanisms in Transportation Public-Private Partnerships. Dans: Journal of Construction Engineering and Management, v. 143, n. 12 (décembre 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001397
-
Garvin, Michael J. (2007): Rethinking mega-project development strategies: A case study of the Central Artery/Tunnel Project. Dans: Structure and Infrastructure Engineering, v. 3, n. 2 (juin 2007).
https://doi.org/10.1080/15732470600590796
-
Shan, Liang / Garvin, Michael J. / Kumar, Raman (2010): Collar options to manage revenue risks in real toll public‐private partnership transportation projects. Dans: Construction Management and Economics, v. 28, n. 10 (octobre 2010).
https://doi.org/10.1080/01446193.2010.506645
-
Chiara, Nicola / Garvin, Michael J. (2008): Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Dans: Construction Management and Economics, v. 26, n. 9 (septembre 2008).
https://doi.org/10.1080/01446190802259027
-
Garvin, Michael J. / Cheah, Charles Y. J. (2004): Valuation techniques for infrastructure investment decisions. Dans: Construction Management and Economics, v. 22, n. 4 (mai 2004).
https://doi.org/10.1080/01446190310001649010
-
Jordan, Elizabeth / Gross, Martha E. / Javernick-Will, Amy Nicole / Garvin, Michael J. (2011): Use and misuse of qualitative comparative analysis. Dans: Construction Management and Economics, v. 29, n. 11 (novembre 2011).
https://doi.org/10.1080/01446193.2011.640339
-
Garvin, Michael J. (2009): Procurement Systems: A Cross‐Industry Project Management Perspective. Dans: Construction Management and Economics, v. 27, n. 6 (juin 2009).
https://doi.org/10.1080/01446190902954139