- (2021): Study on Optimization of Delay Method of Wedge Cut Blasting in Tunnel. Dans: Shock and Vibration, v. 2021 (janvier 2021).
- A study of innovative cut blasting for rock roadway excavation based on numerical simulation and field tests. Dans: Tunnelling and Underground Space Technology, v. 119 (janvier 2022). (2022):