Kirti Gandhi
- Wind study for City Island cable-stayed bridge over Eastchester Bay in the Bronx, New York City. Dans: Bridge Structures, v. 9, n. 1 ( 2013). (2013):
- Controlling Overhead Costs. Dans: Journal of Management in Engineering (ASCE), v. 12, n. 4 (juillet 1996). (1996):