- Active BIM system for optimized multi-project ready-mix-concrete delivery. Dans: Engineering, Construction and Architectural Management. :
- Digitalization and automation in construction project’s life-cycle: a review. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022). (2022):
- (2021): A Systematic Review of Construction 4.0 in the Context of the BIM 4.0 Premise. Dans: Buildings, v. 11, n. 8 (27 juillet 2021).
- (2020): Review of the Construction Labour Demand and Shortages in the EU. Dans: Buildings, v. 11, n. 1 (22 décembre 2020).
- Scenario Simulation Model of the Production, Transportation and Asphalt Paving. Dans: Organization, Technology and Management in Construction, v. 7, n. 3 (décembre 2015). (2015):
- (2018): Optimizacija građevinskih procesa – metode, alati i primjena. Construction process optimisation – review of methods, tools and applications. Dans: Građevinar, v. 70, n. 7 (septembre 2018).
- (2019): Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Dans: Buildings, v. 9, n. 1 (janvier 2019).
- (2016): Scenarijski simulacijski model za optimalnu alokaciju građevinskih strojeva. Dans: Građevinar, v. 68, n. 2 (février 2016).