K. Furukawa
- デザインビルド方式で発注された新東名高速道路青木川橋(仮称)の設計および施工 (Design and Construction of the New TOMEI Expressway Aokigawa Bridge (a tentative name) Ordered with the Design-Build Bidding System). Dans: Concrete Journal (JCI), v. 51, n. 11 ( 2013). (2013):
- Optimum Cable-Force Adjustments in Concrete Cable-Stayed Bridges. Dans: Journal of Structural Engineering (ASCE), v. 121, n. 4 (avril 1995). (1995):