Martin Furrer
- Planning and design of the Gordie Howe International Bridge. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 176, n. 4 (décembre 2023). (2023):
- Ready, Set, Launch. Dans: Civil Engineering Magazine, v. 88, n. 5 (mai 2018). (2018):
- (2014): Innovative Network Tied Arch Solution to Spanning the Mississippi River. Présenté pendant: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- (2017): A New Tied Arch to Replace a Rural Mississippi River Crossing. Présenté pendant: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- (2017): Design and Launching of a Redundant Truss over a Busy Rail Yard. Présenté pendant: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- Swift Substitution. Dans: Civil Engineering Magazine, v. 85, n. 5 (mai 2015). (2015):
- (2015): Whipping Effect of the Seismic Response of Unbraced Tied Arch Bridges. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
- (2008): Strengthening of the I-39 Bridges over the Kishwaukee River. Présenté pendant: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008.