Adrian Fontana
- Mehrwerte im maschinellen Tunnelvortrieb durch intelligente Systeme. Dans: Geomechanics and Tunnelling, v. 14, n. 5 (octobre 2021). (2021):
- 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel. Dans: Geomechanics and Tunnelling, v. 12, n. 5 (octobre 2019). (2019):