Chung-Wei Feng
- Clarifying the Relationship between Quality of Global Positioning System Data and Precision of Positioning. Dans: Journal of Surveying Engineering (ASCE), v. 136, n. 1 (février 2010). (2010):
- The Development of BIM Model-based Construction Project Performance Evaluation Mechanism. Dans: Civil Engineering and Architecture, v. 3, n. 5 (octobre 2015). (2015):
- Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems. Dans: Journal of Computing in Civil Engineering, v. 11, n. 3 (juillet 1997). (1997):
- Stochastic Construction Time-Cost Trade-Off Analysis. Dans: Journal of Computing in Civil Engineering, v. 14, n. 2 (avril 2000). (2000):
- Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method. Dans: Journal of Construction Engineering and Management, v. 121, n. 4 (décembre 1995). (1995):
- Using the MD CAD model to develop the time–cost integrated schedule for construction projects. Dans: Automation in Construction, v. 19, n. 3 (mai 2010). (2010):
- Optimizing the schedule of dispatching RMC trucks through genetic algorithms. Dans: Automation in Construction, v. 13, n. 3 (mai 2004). (2004):
- An effective simulation mechanism for construction operations. Dans: Automation in Construction, v. 12, n. 3 (mai 2003). (2003):
- Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks. Dans: Automation in Construction, v. 15, n. 2 (mars 2006). (2006):
- An integrated modeling mechanism for optimizing the simulation model of the construction operation. Dans: Automation in Construction, v. 15, n. 3 (mai 2006). (2006):
- A hybrid mechanism for optimizing construction simulation models. Dans: Automation in Construction, v. 14, n. 1 (janvier 2005). (2005):
- The LP/IP hybrid method for construction time-cost trade-off analysis. Dans: Construction Management and Economics, v. 14, n. 3 (mai 1996). (1996):
- Using a Simple Soil Spring Model and Support Vector Machine to Determine Bridge Scour Depth and Bridge Safety. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 4 (août 2016). (2016):
- Hybridization of Finite-Element Method and Support Vector Machine to Determine Scour Bridge Safety Level. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 3 (juin 2015). (2015):
- The Web-based real time bridge scour monitoring system for disaster management. Dans: The Baltic Journal of Road and Bridge Engineering, v. 9, n. 1 (mars 2014). (2014):