-
Kedir, Nebiyu / Fayek, Aminah Robinson (2023): Integrated FAHP-FDEMATEL for determining causal relationships in construction crew productivity modelling. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 11 (novembre 2023).
https://doi.org/10.1139/cjce-2022-0425
-
Fateminia, Seyed Hamed / Fayek, Aminah Robinson (2023): Hybrid fuzzy arithmetic-based model for determining contingency reserve. Dans: Automation in Construction, v. 151 (juillet 2023).
https://doi.org/10.1016/j.autcon.2023.104858
-
Kedir, Nebiyu Siraj / Somi, Sahand / Fayek, Aminah Robinson / Nguyen, Phuong H. D. (2022): Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling. Dans: Automation in Construction, v. 142 (octobre 2022).
https://doi.org/10.1016/j.autcon.2022.104498
-
Ebrahimi, Sara / Kazerooni, Matin / Sumati, Vuppuluri / Fayek, Aminah Robinson (2022): Predictive Model for Construction Labour Productivity Using Hybrid Feature Selection and Principal Component Analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 8 (1 août 2022).
https://doi.org/10.1139/cjce-2021-0248
-
Tiruneh, Getaneh Gezahegne / Fayek, Aminah Robinson (2022): Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction. Dans: Journal of Construction Engineering and Management, v. 148, n. 4 (avril 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002250
-
Raoufi, Mohammad / Fayek, Aminah Robinson (2022): New Modes of Operating for Construction Organizations during the COVID-19 Pandemic: Challenges, Actions, and Future Best Practices. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 2 (mars 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0001009
-
Gerami Seresht, Nima / Fayek, Aminah Robinson (2022): Modeling Earthmoving Operations in Real-Time Using Hybrid Fuzzy Simulation. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 4 (avril 2022).
https://doi.org/10.1139/cjce-2020-0790
-
Raoufi, Mohammad / Fayek, Aminah Robinson (2021): How to Improve Crew Motivation and Performance on Construction Sites. Dans: Journal of Construction Engineering and Management, v. 147, n. 9 (septembre 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002131
-
Raoufi, Mohammad / Fayek, Aminah Robinson (2021): Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Dans: Construction Innovation, v. 21, n. 3 (10 juillet 2021).
https://doi.org/10.1108/ci-03-2020-0045
-
Siraj, Nasir Bedewi / Fayek, Aminah Robinson (2021): Hybrid Fuzzy System Dynamics Model for Analyzing the Impacts of Interrelated Risk and Opportunity Events on Project Contingency. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 8 (août 2021).
https://doi.org/10.1139/cjce-2020-0032
-
Tiruneh, Getaneh Gezahegne / Fayek, Aminah Robinson / Sumati, Vuppuluri (2020): Neuro-fuzzy systems in construction engineering and management research. Dans: Automation in Construction, v. 119 (novembre 2020).
https://doi.org/10.1016/j.autcon.2020.103348
-
Fayek, Aminah Robinson (2020): Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management. Dans: Journal of Construction Engineering and Management, v. 146, n. 7 (juillet 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001854
-
Raoufi, Mohammad / Fayek, Aminah Robinson (2020): Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance. Dans: Journal of Construction Engineering and Management, v. 146, n. 5 (mai 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001826
-
Omar, Moataz Nabil / Fayek, Aminah Robinson: Organizational Competencies and Project Performance Tool (OCPPT©): Evaluating Construction Project Competencies and Performance. Dans: International Journal of Architecture Engineering and Construction.
https://doi.org/10.7492/ijaec.2016.004
-
Raoufi, Mohammad / Fayek, Aminah Robinson (2018): Key Moderators of the Relationship between Construction Crew Motivation and Performance. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001509
-
Fayek, Aminah Robinson / Oduba, Ayodele (2005): Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. Dans: Journal of Construction Engineering and Management, v. 131, n. 8 (août 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:8(938)
-
Oliveros, Adriana V. Ordóñez / Fayek, Aminah Robinson (2005): Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating. Dans: Journal of Construction Engineering and Management, v. 131, n. 1 (janvier 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:1(42)
-
Elbarkouky, Mohamed M. G. / Fayek, Aminah Robinson (2011): Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. Dans: Journal of Construction Engineering and Management, v. 137, n. 6 (juin 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000310
-
Elbarkouky, Mohamed M. G. / Fayek, Aminah Robinson (2011): Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System. Dans: Journal of Construction Engineering and Management, v. 137, n. 8 (août 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000334
-
Omar, Moataz Nabil / Fayek, Aminah Robinson (2016): Modeling and evaluating construction project competencies and their relationship to project performance. Dans: Automation in Construction, v. 69 (septembre 2016).
https://doi.org/10.1016/j.autcon.2016.05.021
-
Abdelgawad, Mohamed / Fayek, Aminah Robinson (2011): Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis. Dans: Journal of Construction Engineering and Management, v. 137, n. 4 (avril 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000285
-
Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, S. M. (2007): Fuzzy Numbers in Cost Range Estimating. Dans: Journal of Construction Engineering and Management, v. 133, n. 4 (avril 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:4(325)
-
Daoud, Ahmed Osama / Tsehayae, Abraham Assefa / Fayek, Aminah Robinson (2017): guided evaluation of the impact of research and development partnerships on university, industry, and government. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 4 (avril 2017).
https://doi.org/10.1139/cjce-2016-0381
-
Golabchi, Alireza / Han, SangUk / Fayek, Aminah Robinson (2016): fuzzy logic approach to posture-based ergonomic analysis for field observation and assessment of construction manual operations. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (avril 2016).
https://doi.org/10.1139/cjce-2015-0143
-
Knight, Karla / Fayek, Aminah Robinson (2000): A preliminary study of the factors affecting the cost escalation of construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 27, n. 1 (février 2000).
https://doi.org/10.1139/l99-057
-
Fayek, Aminah Robinson / Shaheen, Ahmed / Oduba, Ayo (2003): Results of a pilot study to examine the effective integration of apprentices into the industrial construction sector. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 2 (avril 2003).
https://doi.org/10.1139/l02-106
-
Rankin, Jeff / Fayek, Aminah Robinson / Meade, Gerry / Haas, Carl / Manseau, André (2008): Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 9 (septembre 2008).
https://doi.org/10.1139/l08-018
-
Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, Simaan M. (2009): Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (septembre 2009).
https://doi.org/10.1139/l09-091
-
Poveda, Cesar Augusto / Fayek, Aminah Robinson (2009): Predicting and Evaluating Construction Trades Foremen Performance: Fuzzy Logic Approach. Dans: Journal of Construction Engineering and Management, v. 135, n. 9 (septembre 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000061
-
Tsehayae, Abraham Assefa / Fayek, Aminah Robinson (2014): Identification and comparative analysis of key parameters influencing construction labour productivity in building and industrial projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (octobre 2014).
https://doi.org/10.1139/cjce-2014-0031