Ebrahim Farrokh
- Discussion of cutterhead opening design for earth pressure balance machines (EPBMs) in soft grounds. Dans: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. :
- Using field data and operational constraints to maximize hard rock TBM penetration and advance rates. Dans: Tunnelling and Underground Space Technology, v. 125 (juillet 2022). (2022):
- Volume loss and face pressure evaluation in Tehran metro line 6, south extension. Dans: Tunnelling and Underground Space Technology, v. 116 (octobre 2021). (2021):
- Cutter change time and cutter consumption for rock TBMs. Dans: Tunnelling and Underground Space Technology, v. 114 (août 2021). (2021):
- Uniformly distributed lace design for hard rock TBMs. Dans: Tunnelling and Underground Space Technology, v. 110 (avril 2021). (2021):
- Optimum design of the peripheral cutters’ specification on the head profile for hard-rock TBMs. Dans: Tunnelling and Underground Space Technology, v. 107 (janvier 2021). (2021):
- A study of various models used in the estimation of advance rates for hard rock TBMs. Dans: Tunnelling and Underground Space Technology, v. 97 (mars 2020). (2020):
- TBM 디스크 커터의 수명 예측 방법 개발 (Development of a new test method for the prediction of TBM disc cutters life). Dans: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 19, n. 3 (mai 2017). (2017):
- Study of various models for estimation of penetration rate of hard rock TBMs. Dans: Tunnelling and Underground Space Technology, v. 30 (juillet 2012). (2012):
- Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project. Dans: Tunnelling and Underground Space Technology, v. 21, n. 5 (septembre 2006). (2006):
- Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran. Dans: Tunnelling and Underground Space Technology, v. 23, n. 6 (novembre 2008). (2008):
- Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Dans: Tunnelling and Underground Space Technology, v. 24, n. 4 (juillet 2009). (2009):
- Advance rate simulation for hard rock TBMs. Dans: KSCE Journal of Civil Engineering, v. 18, n. 3 (mars 2014). (2014):
- discussion on hard rock TBM cutter wear and cutterhead intervention interval length evaluation. Dans: Tunnelling and Underground Space Technology, v. 81 (novembre 2018). (2018):