Hunar Farid Hama Ali
- Predicting construction time and cost of tunnels using Markov chain model considering opinions of experts. Dans: Tunnelling and Underground Space Technology, v. 116 (octobre 2021). (2021):
- Machine learning forecasting models of disc cutters life of tunnel boring machine. Dans: Automation in Construction, v. 128 (août 2021). (2021):
- Presenting the best prediction model of water inflow into drill and blast tunnels among several machine learning techniques. Dans: Automation in Construction, v. 127 (juillet 2021). (2021):
- Development of fracture mechanics model of beam retrofitted with CFRP plate subjected to cyclic loading. Dans: Journal of Mechanics of Materials and Structures, v. 14, n. 3 (octobre 2019). (2019):
- Dynamic reduction of time and cost uncertainties in tunneling projects. Dans: Tunnelling and Underground Space Technology, v. 109 (mars 2021). (2021):
- Forecasting sidewall displacement of underground caverns using machine learning techniques. Dans: Automation in Construction, v. 123 (mars 2021). (2021):
- Forecasting maximum surface settlement caused by urban tunneling. Dans: Automation in Construction, v. 120 (décembre 2020). (2020):