R. H. Falkiner
- Some Design and Construction Features of the Cruachan Pumped Storage Project. Dans: Proceedings of the Institution of Civil Engineers, v. 35, n. 3 (novembre 1966). (1966):
- The Tyne Tunnel: Construction of the Main Tunnel. Dans: Proceedings of the Institution of Civil Engineers, v. 39, n. 2 (février 1968). (1968):
- The Claerwen Dam. Dans: Proceedings of the Institution of Civil Engineers, v. 2, n. 3 (mai 1953). (1953):