-
Nilsson Vestola, Emilia / Eriksson, Per Erik (2022): Engineered and emerged collaboration: vicious and virtuous cycles. Dans: Construction Management and Economics, v. 41, n. 1 (novembre 2022).
https://doi.org/10.1080/01446193.2022.2140815
-
Järvenpää, Anna-Therése / Larsson, Johan / Eriksson, Per Erik (2023): How public client’s control systems affect contractors’ innovation possibilities. Dans: Construction Innovation, v. 24, n. 7 (décembre 2023).
https://doi.org/10.1108/ci-03-2022-0054
-
Granheimer, Klara / Gustavsson, Tina Karrbom / Eriksson, Per Erik (2023): Public procurement of engineering services: the influence of task characteristics on organisational control. Dans: Engineering, Construction and Architectural Management, v. 31, n. 13 (novembre 2023).
https://doi.org/10.1108/ecam-01-2022-0055
-
Larsson, Johan / Eriksson, Per Erik / Lingegård, Sofia / Järvenpää, Anna-Therése (2022): Innovation outcomes and processes in infrastructure projects – a comparative study of Design-Build and Design-Build-Maintenance contracts. Dans: Construction Management and Economics, v. 40, n. 2 (16 janvier 2022).
https://doi.org/10.1080/01446193.2021.2024864
-
Järvenpää, Anna-Therése / Eriksson, Per Erik / Larsson, Johan (2021): Exploring a public client’s control systems in infrastructure projects from a relationship history perspective. Dans: Construction Management and Economics, v. 40, n. 1 (décembre 2021).
https://doi.org/10.1080/01446193.2021.2014064
-
Ekeskär, Andreas / Havenvid, Malena I. / Gustavsson, Tina Karrbom / Eriksson, Per Erik (2021): Construction logistics in a multi-project context: coopetition among main contractors and the role of third-party logistics providers. Dans: Construction Management and Economics, v. 40, n. 1 (décembre 2021).
https://doi.org/10.1080/01446193.2021.2012815
-
Eriksson, Per Erik / Olander, Stefan / Szentes, Henrik / Widen, Kristian (2013): Managing short-term efficiency and long-term development through industrialized construction. Dans: Construction Management and Economics, v. 32, n. 1-2 (juillet 2013).
https://doi.org/10.1080/01446193.2013.814920
-
Larsson, Johan / Eriksson, Per Erik / Olofsson, Thomas / Simonsson, Peter (2013): Industrialized construction in the Swedish infrastructure sector: core elements and barriers. Dans: Construction Management and Economics, v. 32, n. 1-2 (juillet 2013).
https://doi.org/10.1080/01446193.2013.833666
-
Eriksson, Per Erik / Laan, Albertus (2007): Procurement effects on trust and control in client‐contractor relationships. Dans: Engineering, Construction and Architectural Management, v. 14, n. 4 (juillet 2007).
https://doi.org/10.1108/09699980710760694
-
Eriksson, Per Erik / Nilsson, TorBjörn / Atkin, Brian (2008): Client perceptions of barriers to partnering. Dans: Engineering, Construction and Architectural Management, v. 15, n. 6 (novembre 2008).
https://doi.org/10.1108/09699980810916979
-
Eriksson, Per Erik / Atkin, Brian / Nilsson, TorBjörn (2009): Overcoming barriers to partnering through cooperative procurement procedures. Dans: Engineering, Construction and Architectural Management, v. 16, n. 6 (novembre 2009).
https://doi.org/10.1108/09699980911002593
-
Szentes, Henrik / Eriksson, Per Erik (2013): Societal Changes and New Conditions for the Management of Large Construction Projects. Dans: The Open Construction and Building Technology Journal, v. 7, n. 1 (décembre 2013).
https://doi.org/10.2174/1874836820131111006
-
Pesämaa, Ossi / Larsson, Johan / Eriksson, Per Erik (2018): Role of Performance Feedback on Process Performance in Construction Projects: Client and Contractor Perspectives. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 4 (juillet 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000619
-
Larsson, Johan / Eriksson, Per Erik / Olofsson, Thomas / Simonsson, Peter (2015): Leadership in Civil Engineering: Effects of Project Managers’ Leadership Styles on Project Performance. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 6 (novembre 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000367
-
Eriksson, Per Erik / Nilsson, TorBjörn (2008): Partnering the Construction of a Swedish Pharmaceutical Plant: Case Study. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 4 (octobre 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:4(227)
-
Hedborg Bengtsson, Susanna / Gustavsson, Tina Karrbom / Eriksson, Per Erik (2018): Users' influence on inter-organizational innovation: mapping the receptive context. Dans: Construction Innovation, v. 18, n. 4 (octobre 2018).
https://doi.org/10.1108/ci-12-2017-0095
-
Eriksson, Per Erik / Szentes, Henrik (2017): Managing the tensions between exploration and exploitation in large construction projects. Dans: Construction Innovation, v. 17, n. 4 (octobre 2017).
https://doi.org/10.1108/ci-05-2016-0032
-
Vennström, Anders / Eriksson, Per Erik (2010): Client perceived barriers to change of the construction process. Dans: Construction Innovation, v. 10, n. 2 (avril 2010).
https://doi.org/10.1108/14714171011037156
-
Eriksson, Per Erik (2008): Procurement Effects on Coopetition in Client-Contractor Relationships. Dans: Journal of Construction Engineering and Management, v. 134, n. 2 (février 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:2(103)
-
Szentes, Henrik / Eriksson, Per Erik (2016): Paradoxical Organizational Tensions between Control and Flexibility When Managing Large Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 4 (avril 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001081
-
Eriksson, Per Erik (2010): Understanding the Construction Client. Dans: Construction Management and Economics, v. 28, n. 11 (novembre 2010).
https://doi.org/10.1080/01446191003702450
-
Osipova, Ekaterina / Eriksson, Per Erik (2011): How procurement options influence risk management in construction projects. Dans: Construction Management and Economics, v. 29, n. 11 (novembre 2011).
https://doi.org/10.1080/01446193.2011.639379
-
Eriksson, Per Erik / Pesämaa, Ossi (2007): Modelling procurement effects on cooperation. Dans: Construction Management and Economics, v. 25, n. 8 (août 2007).
https://doi.org/10.1080/01446190701468844
-
Eriksson, Per Erik (2010): Partnering: what is it, when should it be used, and how should it be implemented?. Dans: Construction Management and Economics, v. 28, n. 9 (septembre 2010).
https://doi.org/10.1080/01446190903536422