Ahmed Ebrahim Abu El-Maaty
- Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 5 (septembre 2017). (2017):
- Proposed models to measure the quality of highway projects. Regression analysis vs statistical – fuzzy approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017). (2017):
- (2016): Management of Highway Projects in Egypt through Identifying Factors Influencing Quality Performance. Dans: Journal of Construction Engineering, v. 2016 ( 2016).