-
Dzeng, Ren-Jye / Cheng, Chen-Wei / Cheng, Ching-Yu (2024): A Scaffolding Assembly Deficiency Detection System with Deep Learning and Augmented Reality. Dans: Buildings, v. 14, n. 2 (1 février 2024).
https://doi.org/10.3390/buildings14020385
-
Huang, Shih-Fang / Chen, Chun-Sung / Dzeng, Ren-Jye (2011): Design of Track Alignment Using Building Information Modeling. Dans: Journal of Transportation Engineering, v. 137, n. 11 (novembre 2011).
https://doi.org/10.1061/(asce)te.1943-5436.0000287
-
Dzeng, Ren-Jye / Wu, Jih-Shong (2013): Efficiency measurement of the construction industry in Taiwan: a stochastic frontier cost function approach. Dans: Construction Management and Economics, v. 31, n. 4 (avril 2013).
https://doi.org/10.1080/01446193.2013.787162
-
Dzeng, Ren-Jye / Wang, Wei-Chih / Hsiao, Fan-Yi / Xie, Yan-Qing (2015): An Activity-Based Simulation Model for Assessing Function Space Assignment for Buildings: A Service Performance Perspective. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 12 (novembre 2015).
https://doi.org/10.1111/mice.12177
-
Dzeng, Ren-Jye (2018): Applications of ICTs and Action Recognition for Construction Workers. Dans: Trends in Civil Engineering and its Architecture, v. 1, n. 3 (février 2018).
https://doi.org/10.32474/tceia.2018.01.000113
-
Dzeng, Ren-Jye (2012): The Cost Efficiency of Construction Industry in Taiwan. Dans: The Open Construction and Building Technology Journal, v. 6, n. 1 (décembre 2012).
https://doi.org/10.2174/1874836801206010008
-
Wang, Wei-Chih / Bilozerov, Tymur / Dzeng, Ren-Jye / Hsiao, Fan-Yi / Wang, Kun-Chi (2017): Conceptual Cost Estimations Using Neuro-fuzzy and Multi-factor Evaluation Methods for Building Projects. Dans: Journal of Civil Engineering and Management, v. 23, n. 1 (janvier 2017).
https://doi.org/10.3846/13923730.2014.948908
-
Dzeng, Ren-Jye / Wang, Wei-Chih / Hsiao, Fan-Yi (2015): Function-space Assignment and Movement Simulation Model for Building Renovation. Dans: Journal of Civil Engineering and Management, v. 21, n. 5 (mai 2015).
https://doi.org/10.3846/13923730.2014.890652
-
Chen, Chun-Sung / Tsui, Yu-Kun / Dzeng, Ren-Jye / Wang, Wei-Chih (2014): Application of Project-based Change Management in Construction: A Case Study. Dans: Journal of Civil Engineering and Management, v. 21, n. 1 (décembre 2014).
https://doi.org/10.3846/13923730.2013.802712
-
Wu, Jih-Shong / Dzeng, Ren-Jye (2007): Tile Renovation of Exterior Walls for the Taiwan Governor's Office. Dans: Architectural Science Review, v. 50, n. 3 (septembre 2007).
https://doi.org/10.3763/asre.2007.5031
-
Dzeng, Ren-Jye / Tommelein, Iris D. (1997): Boiler Erection Scheduling Using Product Models and Case-Based Reasoning. Dans: Journal of Construction Engineering and Management, v. 123, n. 3 (septembre 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:3(338)
-
Dzeng, Ren-Jye (2006): Identifying a Design Management Package to Support Concurrent Design in Building Wafer Fabrication Facilities. Dans: Journal of Construction Engineering and Management, v. 132, n. 6 (juin 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:6(606)
-
Tserng, H. Ping / Dzeng, Ren-Jye / Lin, Yu-Cheng / Lin, Sheng-Tai (2005): Mobile Construction Supply Chain Management Using PDA and Bar Codes. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (juillet 2005).
https://doi.org/10.1111/j.1467-8667.2005.00391
-
Dzeng, Ren-Jye / Lin, Yu-Chun (2005): Searching for Better Negotiation Agreement Based on Genetic Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (juillet 2005).
https://doi.org/10.1111/j.1467-8667.2005.00393
-
Wang, Wei-Chih / Dzeng, Ren-Jye / Lu, Yu-Huang (2007): Integration of Simulation-Based Cost Model and Multi-Criteria Evaluation Model for Bid Price Decisions. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 22, n. 3 (avril 2007).
https://doi.org/10.1111/j.1467-8667.2007.00480.x
-
Dzeng, Ren-Jye / Lee, Hsin-Yun (2004): Critiquing contractors' scheduling by integrating rule-based and case-based reasoning. Dans: Automation in Construction, v. 13, n. 5 (septembre 2004).
https://doi.org/10.1016/j.autcon.2004.03.004
-
Dzeng, Ren-Jye / Tommelein, Iris D. (2004): Product modeling to support case-based construction planning and scheduling. Dans: Automation in Construction, v. 13, n. 3 (mai 2004).
https://doi.org/10.1016/j.autcon.2003.10.002
-
Dzeng, Ren-Jye / Wang, Wei-Chih (2003): Automatic schedule integration for highway projects. Dans: Automation in Construction, v. 12, n. 4 (juillet 2003).
https://doi.org/10.1016/s0926-5805(03)00017-7
-
Dzeng, Ren-Jye / Pan, Nang-Fei (2006): Learning heuristics for determining slurry wall panel lengths. Dans: Automation in Construction, v. 15, n. 3 (mai 2006).
https://doi.org/10.1016/j.autcon.2005.06.003
-
Dzeng, Ren-Jye / Chang, Shih-Yu (2005): Learning search keywords for construction procurement. Dans: Automation in Construction, v. 14, n. 1 (janvier 2005).
https://doi.org/10.1016/j.autcon.2004.06.003
-
Dzeng, Ren-Jye / Lin, Chong-Wey / Hsiao, Fan-Yi (2014): Application of RFID tracking to the optimization of function-space assignment in buildings. Dans: Automation in Construction, v. 40 (avril 2014).
https://doi.org/10.1016/j.autcon.2013.12.011
-
Dzeng, Ren-Jye / Fang, Yi-Cho / Chen, I-Chung (2014): A feasibility study of using smartphone built-in accelerometers to detect fall portents. Dans: Automation in Construction, v. 38 (mars 2014).
https://doi.org/10.1016/j.autcon.2013.11.004
-
Fang, Yi-Cho / Dzeng, Ren-Jye (2017): Accelerometer-based fall-portent detection algorithm for construction tiling operation. Dans: Automation in Construction, v. 84 (décembre 2017).
https://doi.org/10.1016/j.autcon.2017.09.015
-
Dzeng, Ren-Jye / Wang, Pei-Ru (2017): C-Negotiation Game: An educational game model for construction procurement and negotiation. Dans: Automation in Construction, v. 75 (mars 2017).
https://doi.org/10.1016/j.autcon.2016.11.010