Onur Dursun
- Determinants of construction duration for building projects in Germany. Dans: Engineering, Construction and Architectural Management, v. 19, n. 4 (juin 2012). (2012):
- Energy dissipation and performance assessment of double damped outriggers in tall buildings under strong earthquakes. Dans: The Structural Design of Tall and Special Buildings, v. 28, n. 1 (janvier 2019). (2019):
- Time–cost relationship of building projects: statistical adequacy of categorization with respect to project location. Dans: Construction Management and Economics, v. 29, n. 1 (janvier 2011). (2011):
- Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016). (2016):