J. S. Du
- Creep analysis of concrete filled steel tube arch bridges. Dans: Structural Engineering and Mechanics, v. 27, n. 6 (décembre 2007). (2007):
- Flexural ductility of prestressed concrete beams with unbonded tendons. Dans: Computers and Concrete, v. 6, n. 6 (décembre 2009). (2009):
- Deterministic and reliability analysis of prestressed concrete bridge girders: comparison of the Chinese, Hong Kong and AASHTO LRFD Codes. Dans: Structural Safety, v. 27, n. 3 (juillet 2005). (2005):
- Prediction of ultimate stress in unbonded prestressed tendons. Dans: Magazine of Concrete Research, v. 56, n. 1 (février 2004). (2004):
- Service load analysis of unbonded partially prestressed concrete members. Dans: Magazine of Concrete Research, v. 57, n. 4 (mai 2005). (2005):
- Estimation of ultimate stress in external FRP tendons. Dans: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 162, n. 4 (août 2009). (2009):
- Ductility analysis of prestressed concrete beams with unbonded tendons. Dans: Engineering Structures, v. 30, n. 1 (janvier 2008). (2008):
- Deformability of concrete beams with unbonded FRP tendons. Dans: Engineering Structures, v. 30, n. 12 (décembre 2008). (2008):
- Deflection of unbonded partially prestressed concrete continuous beams. Dans: Engineering Structures, v. 118 (juillet 2016). (2016):
- Partially prestressed concrete. Dans: Progress in Structural Engineering and Materials, v. 6, n. 2 (avril 2004). (2004):