Derek Drew
- The analysis of pre‐tender building price forecasting performance: a case study. Dans: Engineering, Construction and Architectural Management, v. 10, n. 1 (février 2003). (2003):
- Modelling contractors' mark‐up behaviour in different construction markets. Dans: Engineering, Construction and Architectural Management, v. 14, n. 5 (septembre 2007). (2007):
- The effect of client and type and size of construction work on a contractor’s bidding strategy. Dans: Building and Environment, v. 36, n. 3 (avril 2001). (2001):
- (2008): Comparing Contractors' Decision to Bid in Different Market Environments. Dans: Australasian Journal of Construction Economics and Building, v. 8, n. 1 (novembre 2008).
- Determining the Optimal Fee-Technical Proposal Combination in Two Envelope Fee Bidding. Dans: Australasian Journal of Construction Economics and Building, v. 2, n. 2 (novembre 2002). (2002):
- Optimal Bid Model for Price-Time Biparameter Construction Contracts. Dans: Journal of Construction Engineering and Management, v. 125, n. 3 (juin 1999). (1999):
- Bid-Spread. Dans: Journal of Construction Engineering and Management, v. 127, n. 2 (avril 2001). (2001):
- The effect of contract type and size on competitiveness in bidding. Dans: Construction Management and Economics, v. 15, n. 5 (septembre 1997). (1997):
- Implementing corporate ethics management and its comparison with the safety management system: a case study in Hong Kong. Dans: Construction Management and Economics, v. 22, n. 6 (juillet 2004). (2004):