Saeid R. Dindarloo
- Work breakdown structure (WBS) development for underground construction. Dans: Automation in Construction, v. 58 (octobre 2015). (2015):
- Maximum surface settlement based classification of shallow tunnels in soft ground. Dans: Tunnelling and Underground Space Technology, v. 49 (juin 2015). (2015):