Timothy J. Dickson
- The History of the Prestressing Strand Development Length Equation. Dans: PCI Journal, v. 38, n. 6 (novembre 1993). (1993):
- Corrosion Assessment of a 34-Year-Old Precast PostTensioned Concrete Girder. Dans: PCI Journal, v. 38, n. 6 (novembre 1993). (1993):
- Structural Evaluation of a 34-Year-Old Precast PostTensioned Concrete Girder. Dans: PCI Journal, v. 38, n. 5 (septembre 1993). (1993):