Z. M. Deng
- Multi‐project cash flow optimization: non‐inferior solution through neuro‐multiobjective algorithm. Dans: Engineering, Construction and Architectural Management, v. 8, n. 2 (février 2001). (2001):
- Evaluation of construction methods and performance for high rise public housing construction in Hong Kong. Dans: Building and Environment, v. 37, n. 10 (octobre 2002). (2002):
- ISO 14000 and the Construction Industry: Survey in China. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 3 (juillet 2003). (2003):
- Overcoming Problems Associated with Sustainable Development of the Construction Industry in China. Dans: Architectural Science Review, v. 46, n. 4 (décembre 2003). (2003):
- Quality Certification Scheme in the Construction Industry of China. Dans: Architectural Science Review, v. 45, n. 2 (juin 2002). (2002):
- The Rise and Fall of Total Quality Management in the Chinese Construction Industry. Dans: Architectural Science Review, v. 46, n. 2 (juin 2003). (2003):
- An application of the Internet-based project management system. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001). (2001):
- Quest for continuous quality improvement for public housing construction in Hong Kong. Dans: Construction Management and Economics, v. 18, n. 4 (juin 2000). (2000):
- Capital budget planning practices of building contractors in Hong Kong. Dans: Construction Management and Economics, v. 19, n. 6 (octobre 2001). (2001):