T. J. Deepak
- The Threshold for Under-Reinforced Concrete Sections Proposed by ACI 318, EC 2 and BS 8110. Dans: Civil Engineering and Architecture, v. 9, n. 6 (octobre 2021). (2021):
- Analysis of delays in Tanzanian construction industry. Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Dans: Engineering, Construction and Architectural Management, v. 24, n. 2 (mars 2017). (2017):