Kensuke Date
- Preliminary Study on In-Situ Modulus Measurement Using Knocking Ball Test; A Case Study on Setul Limestone. Dans: KSCE Journal of Civil Engineering, v. 27, n. 8 (juin 2023). (2023):
- A Study Of Posture Change Prediction Of Multi-shield Tunneling Machine. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1999, n. 630 (septembre 1999). (1999):
- Supporting Effect Of Tunnel Forepiling With Injection. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2003, n. 736 (juin 2003). (2003):
- Development Of An Effective Forepiling Method With Middle Length Pipes. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2004, n. 756 (mars 2004). (2004):
- Development of a new deformation-controlled rock bolt: Numerical modelling and laboratory verification. Dans: Tunnelling and Underground Space Technology, v. 98 (avril 2020). (2020):