- An integrated multi-criteria decision making approach for selecting the starting location of railroad projects. Dans: Engineering, Construction and Architectural Management. :
- Optimum Finance-Based Scheduling. Dans: Journal of Construction Engineering and Management, v. 150, n. 9 (septembre 2024). (2024):
- An advanced decision-support system for ranking unbalanced bids. Dans: Construction Management and Economics, v. 42, n. 7 (février 2024). (2024):
- Investigating the impact of emerging technologies on construction safety performance. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022). (2022):
- Civil engineers’ personal values/demographics linkage in project team building. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017). (2017):
- Resource Leveling in Line-of-Balance Scheduling. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 9 (septembre 2013). (2013):
- Impact of Personal Demographics on Civil Engineers’ Motivators: Case Study of Turkey. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 2 (mars 2016). (2016):
- Impacts of Different Objective Functions on Resource Leveling in Construction Projects: A Case Study. Dans: Journal of Civil Engineering and Management, v. 20, n. 4 (juillet 2014). (2014):
- Impacts of different objective functions on resource leveling in Line-of-Balance scheduling. Dans: KSCE Journal of Civil Engineering, v. 20, n. 1 (février 2015). (2015):
- Multiresource Leveling in Line-of-Balance Scheduling. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013). (2013):