Marc Comulada
- TBM excavation of São Paulo Metro Line 6 South in heterogeneous ground in urban area. Dans: Geomechanics and Tunnelling, v. 17, n. 4 (août 2024). (2024):
- Sydney Metro - ground characterisation and TBM selection for the Sydney Harbour crossing. Dans: Geomechanics and Tunnelling, v. 11, n. 1 (février 2018). (2018):
- São Paulo Metro - developments in shield tunnelling. Dans: Geomechanics and Tunnelling, v. 7, n. 3 ( 2014). (2014):