0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Hossain, M. A. / Chua, D. K. H. / Liu, Z. (2012): Optimizing Concurrent Execution of Design Activities with Minimum Redesign. Dans: Journal of Computing in Civil Engineering, v. 26, n. 3 (mai 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000150

  2. Hossain, Md. Aslam / Chua, D. K. H. (2010): Autogeneration of Simulation Network of the Design Process. Dans: Journal of Computing in Civil Engineering, v. 24, n. 5 (septembre 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000049

  3. Khalili, A. / Chua, D. K. H. (2015): IFC-Based Graph Data Model for Topological Queries on Building Elements. Dans: Journal of Computing in Civil Engineering, v. 29, n. 3 (mai 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000331

  4. Zhu, Lei / Zhao, Xianbo / Chua, D. K. H. (2016): Agent-Based Debt Terms' Bargaining Model to Improve Negotiation Inefficiency in PPP Projects. Dans: Journal of Computing in Civil Engineering, v. 30, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000571

  5. Chua, D. K. H. / Li, D. (2000): Key Factors in Bid Reasoning Model. Dans: Journal of Construction Engineering and Management, v. 126, n. 5 (octobre 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:5(349)

  6. Weber, Sandra L. / Chua, D. K. H. / Kog, Y. C. / Loh, P. K. / Jaselskis, E. J. (1999): Model for Construction Budget Performance—Neural Network Approach. Dans: Journal of Construction Engineering and Management, v. 125, n. 3 (juin 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(213)

  7. Chua, D. K. H. / Kog, Y. C. / Loh, P. K. (1999): Critical Success Factors for Different Project Objectives. Dans: Journal of Construction Engineering and Management, v. 125, n. 3 (juin 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(142)

  8. Chua, D. K. H. / Li, G. M. (2002): RISim: Resource-Interacted Simulation Modeling in Construction. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(195)

  9. Chua, D. K. H. / Li, D. Z. / Chan, W. T. (2001): Case-Based Reasoning Approach in Bid Decision Making. Dans: Journal of Construction Engineering and Management, v. 127, n. 1 (février 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:1(35)

  10. Chua, D. K. H. / Kog, Y. C. / Loh, P. K. / Jaselskis, E. J. (1997): Model for Construction Budget Performance—Neural Network Approach. Dans: Journal of Construction Engineering and Management, v. 123, n. 3 (septembre 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:3(214)

  11. Chua, D. K. H. / Shen, L. J. / Bok, S. H. (2003): Constraint-Based Planning with Integrated Production Scheduler over Internet. Dans: Journal of Construction Engineering and Management, v. 129, n. 3 (juin 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:3(293)

  12. Chua, D. K. H. / Goh, Y. M. (2004): Incident Causation Model for Improving Feedback of Safety Knowledge. Dans: Journal of Construction Engineering and Management, v. 130, n. 4 (août 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:4(542)

  13. Goh, Y. M. / Chua, D. K. H. (2009): Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000093

  14. Chua, D. K. H. / Kog, Y. C. / Loh, P. K. (2001): A Model For Construction Project Budget And Schedule Performances Using Fuzzy Data. Dans: Civil Engineering and Environmental Systems, v. 18, n. 4 (octobre 2001).

    https://doi.org/10.1080/02630250108970306

  15. Goh, Y. M. / Chua, D. K. H. (2010): Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000116

  16. Chua, D. K. H. / Tyagi, A. / Ling, S. / Bok, S. H. (2003): Process-Parameter-Interface Model for Design Management. Dans: Journal of Construction Engineering and Management, v. 129, n. 6 (décembre 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:6(653)

  17. Chua, D. K. H. / Koh, C. G. / Lo, K. W. (1997): Performance of Urban Rail Transit System: Vibration and Noise Study. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 11, n. 2 (mai 1997).

    https://doi.org/10.1061/(asce)0887-3828(1997)11:2(67)

  18. Chua, D. K. H. / Wang, Y. / Tan, W. T. (2003): Impacts of Obstacles in East Asian Cross-Border Construction. Dans: Journal of Construction Engineering and Management, v. 129, n. 2 (mars - avril 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(131)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine