Seok Ho Cho
- Effects of jack force and construction steps on the change of lining stresses in a TBM tunnel. Dans: KSCE Journal of Civil Engineering, v. 21, n. 4 (juillet 2016). (2016):
- Integrated assessment for route selection of river-crossing pipeline using structural and hydraulic approach. Dans: Structure and Infrastructure Engineering, v. 9, n. 9 (septembre 2013). (2013):
- Blast-induced dynamic response on the interface of a multilayered pipeline. Dans: Structure and Infrastructure Engineering, v. 10, n. 1 (août 2014). (2014):