-
Ma, Qiuwen / Cheung, Sai On / Li, Shan: Managing risks in IPD-ish projects: experience from Hong Kong. Dans: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-01-2023-0007
-
Cao, Nan / Cheung, Sai On (2024): Mediators’ View on Voluntary Construction Dispute Mediation. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 1 (février 2024).
https://doi.org/10.1061/jladah.ladr-1004
-
Lin, Sen / Cheung, Sai On (2023): An Instrument for Identification of Intention to Settle in Project Dispute Negotiation. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 5 (septembre 2023).
https://doi.org/10.1061/jmenea.meeng-5292
-
Ma, Qiuwen / Cheung, Sai On / Li, Shan (2023): Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Dans: Construction Management and Economics, v. 41, n. 6 (janvier 2023).
https://doi.org/10.1080/01446193.2023.2169316
-
Lin, Sen / Cheung, Sai On (2022): Intention to Settle as an Indispensable Element of Negotiated Construction Dispute Settlement. Dans: Journal of Construction Engineering and Management, v. 148, n. 10 (octobre 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002383
-
Cheung, Sai On (2010): Mediation for Improved Conflict Resolution. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 3 (août 2010).
https://doi.org/10.1061/(asce)la.1943-4170.0000035
-
Cheung, Sai On (2020): Legal Affairs and Dispute Resolution Hong Kong Workshop. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (août 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000409
-
Zhu, Liuying / Cheung, Sai On (2020): Power of Incentivization in Construction Dispute Avoidance. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000368
-
Cheung, Sai On (2020): LADR Hong Kong Workshop Review. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000383
-
Cheung, Sai On / Li, Keyao / Levina, Birgitta (2019): Paradox of Bias and Impartiality in Facilitating Construction Dispute Resolution. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 3 (août 2019).
https://doi.org/10.1061/(asce)la.1943-4170.0000295
-
Cheung, Sai On / Xu, Wenqing (2017): Protection of Adjudicators under Security of Payment Legislation. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017).
https://doi.org/10.1061/(asce)la.1943-4170.0000215
-
Xu, Qiang / Cheung, Sai On (2016): Influence of Confucianism and Taoism on Construction Dispute Handling Behaviors in China. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 8, n. 1 (février 2016).
https://doi.org/10.1061/(asce)la.1943-4170.0000166
-
Cheung, Sai On (2015): Special Issue on Practices and Resolution of Progress Payment Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 1 (février 2015).
https://doi.org/10.1061/(asce)la.1943-4170.0000157
-
Cheung, Sai On (2013): Special Issue on Green and Sustainable Construction Projects: The Facets of Sustainability. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 4 (novembre 2013).
https://doi.org/10.1061/(asce)la.1943-4170.0000130
-
Cheung, Sai On (2011): Special Issue on Construction Dispute Negotiation: Nuts and Bolts of Negotiation as a Means of Construction Dispute Resolution. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 3 (août 2011).
https://doi.org/10.1061/(asce)la.1943-4170.0000076
-
Cheung, Sai On / Li, Keyao / Chow, On Yi (2020): Reactive Devaluation as a Psychological Impediment to Construction Dispute Negotiation. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000787
-
Cheung, Sai On / Zhu, Liuying / Wai Lee, Ka (2018): Incentivization and Interdependency in Construction Contracting. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000601
-
Cheung, Sai On / Chow, Pui Ting / Tse, Jo Kenneth Maduramente (2015): Performance of Mediator Tactics in Building Management Disputes. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 2 (mars 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000230
-
Wong, Peter Shek Pui / Cheung, Sai On / Leung, Ka Yan (2008): Moderating Effect of Organizational Learning Type on Performance Improvement. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 3 (juillet 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:3(162)
-
Qu, Yingying / Cheung, Sai On (2014): Pedagogical Principle-Based Experiential E-Learning Exploration in Construction Mediation Training. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 140, n. 2 (avril 2014).
https://doi.org/10.1061/(asce)ei.1943-5541.0000183
-
Suen, Henry / Cheung, Sai On / Lee, Hong Ting (2007): Interlocutory Injunctions in Construction Cases in Hong Kong: Revisiting American Cyanamid Principles. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 4 (octobre 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:4(358)
-
Cheung, Sai On (2006): Mandatory Use of ADR in Construction—A Fundamental Change from Voluntary Participation. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 3 (juillet 2006).
https://doi.org/10.1061/(asce)1052-3928(2006)132:3(224)
-
Yiu, Tak Wing / Cheung, Sai On / Mok, Fung Man (2006): Logistic Likelihood Analysis of Mediation Outcomes. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1026)
-
Cheung, Sai On / Yiu, Tak Wing / Lam, Man Chung (2013): Interweaving Trust and Communication with Project Performance. Dans: Journal of Construction Engineering and Management, v. 139, n. 8 (août 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000681
-
Cheung, Sai On / Suen, Henry C. H. / Cheung, Kevin K. W. (2004): PPMS: a Web-based construction Project Performance Monitoring System. Dans: Automation in Construction, v. 13, n. 3 (mai 2004).
https://doi.org/10.1016/j.autcon.2003.12.001
-
Qu, Yingying / Cheung, Sai On (2012): Logrolling "win–win" settlement in construction dispute mediation. Dans: Automation in Construction, v. 24 (juillet 2012).
https://doi.org/10.1016/j.autcon.2012.02.010
-
Chow, Pui Ting / Kong, Fung / Cheung, Sai On (2012): Mediating and Moderating Effect of Tension on Withdrawal-Commitment Relationship in Construction Dispute Negotiation. Dans: Journal of Construction Engineering and Management, v. 138, n. 10 (octobre 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000528
-
Thomas Ng, S. / Cheung, Sai On / Skitmore, R. Martin / Lam, Ka Chi / Wong, Lai Yi (2000): Prediction of tender price index directional changes. Dans: Construction Management and Economics, v. 18, n. 7 (octobre 2000).
https://doi.org/10.1080/014461900433122
-
Cheung, Sai On (2010): Relational Contracting for Construction Excellence: Principles, Practices and Case Studies. Dans: Construction Management and Economics, v. 28, n. 7 (juillet 2010).
https://doi.org/10.1080/01446193.2010.488268
-
Thomas Ng, S. / Cheung, Sai On / Skitmore, Martin / Wong, Toby C. Y. (2004): An integrated regression analysis and time series model for construction tender price index forecasting. Dans: Construction Management and Economics, v. 22, n. 5 (juin 2004).
https://doi.org/10.1080/0144619042000202799