Franco K. T. Cheung
- Application of cross validation techniques for modelling construction costs during the very early design stage. Dans: Building and Environment, v. 41, n. 12 (décembre 2006). (2006):
- Early stage multi-level cost estimation for schematic BIM models. Dans: Automation in Construction, v. 27 (novembre 2012). (2012):
- Multi-criteria evaluation model for the selection of architectural consultants. Dans: Construction Management and Economics, v. 20, n. 7 (octobre 2002). (2002):
- Explorations in specifying construction price forecast loss functions. Dans: Construction Management and Economics, v. 25, n. 5 (mai 2007). (2007):
- A modified storey enclosure model. Dans: Construction Management and Economics, v. 24, n. 4 (avril 2006). (2006):