Wei-Zhong Chen
- Variation of segment joint opening of underwater shield tunnel during long operational period. Dans: Tunnelling and Underground Space Technology, v. 153 (novembre 2024). (2024):
- Characterization for three-dimensional stress of roadway roof through physics-informed neural network on monitoring data. Dans: Tunnelling and Underground Space Technology, v. 142 (décembre 2023). (2023):
- Overall sensing method for the three-dimensional stress of roadway via machine learning on SHM data. Dans: Structural Health Monitoring, v. 23, n. 1 (mai 2023). (2023):
- Spatial Characterization of Strain Variation in the Profile of Tunnel Structure Using Monitoring Data and Numerical Modeling. Dans: Journal of Infrastructure Systems, v. 28, n. 3 (septembre 2022). (2022):
- Grouting for water and mud inrush control in weathered granite tunnel: A case study. Dans: Engineering Geology, v. 279 (décembre 2020). (2020):
- Field monitoring and numerical analysis of tunnel water inrush and the environmental changes. Dans: Tunnelling and Underground Space Technology, v. 122 (avril 2022). (2022):
- Digital design and stability simulation for large underground powerhouse caverns with parametric model based on BIM-based framework. Dans: Tunnelling and Underground Space Technology, v. 123 (mai 2022). (2022):
- Groundwater-mud control and safety thickness of curtain grouting for the Junchang Tunnel: A case study. Dans: Tunnelling and Underground Space Technology, v. 103 (septembre 2020). (2020):
- Structural health monitoring and analysis of an underwater TBM tunnel. Dans: Tunnelling and Underground Space Technology, v. 82 (décembre 2018). (2018):