Mohammad Hadi Charkhakan
- A New Approach to Risk Analysis: Probability–Impact–Manageability Assessment based on Chain of Risks. Dans: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 47, n. 2 (juillet 2022). (2022):
- Quantifying the predictability and preventability of conflicts between construction project parties. Dans: Engineering, Construction and Architectural Management, v. 30, n. 5 (février 2022). (2022):
- Evaluating the preventability of conflicts arising from change occurrence in construction projects. Dans: Engineering, Construction and Architectural Management, v. 26, n. 8 (août 2019). (2019):
- Predicting Change by Evaluating the Change Implementation Process in Construction Projects Using Event Tree Analysis. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015). (2015):
- Predicting and Tracing Change-Formation Scenarios in Construction Projects Using the DEMATEL Technique. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 6 (novembre 2014). (2014):
- Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran. Dans: Journal of Construction Engineering and Management, v. 144, n. 11 (novembre 2018). (2018):