Jiang Jhy Chang
- Selecting an adequate procedure for the electrochemical chloride removal. Dans: Cement and Concrete Research, v. 36, n. 3 (mars 2006). (2006):
- Properties of pervious concrete made with air-cooling electric arc furnace slag as aggregates. Dans: Construction and Building Materials, v. 93 (septembre 2015). (2015):
- The influences of cement type and curing condition on properties of pervious concrete made with electric arc furnace slag as aggregates. Dans: Construction and Building Materials, v. 197 (février 2019). (2019):
- A study on the efficiency of electrochemical realkalisation of carbonated concrete. Dans: Construction and Building Materials, v. 19, n. 7 (septembre 2005). (2005):