- Novel A + Q Method for Improving Conventional Lowest Bid Contractor Selection Based on Post-performance Records. Dans: KSCE Journal of Civil Engineering, v. 28, n. 11 (3 octobre 2024). (2024):
- Measuring the value and cost of BIM use—an empirical lesson learned from Taiwan’s social housing projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 12 (décembre 2023). (2023):
- Pretendering Decision Model for Contractor Selection of Public Procurement Projects. Dans: Journal of Construction Engineering and Management, v. 146, n. 11 (novembre 2020). (2020):
- A Quantity-Based Method to Predict More Accurate Project Completion Time. Dans: KSCE Journal of Civil Engineering, v. 24, n. 10 (juillet 2020). (2020):
- The Use of a Multiple Risk Level Model to Tackle the Duration of Risk for Construction Activity. Dans: KSCE Journal of Civil Engineering, v. 23, n. 6 (mai 2019). (2019):